Good evening, Dana
Needs your attention
Capture by hour
Metric tons CO2, Central timeToday's activity
● LiveCompleted activity
Every sealed batch, lab result, alert, work order, attestation, and transfer, with who or what completed it.
| Completed | Type | Activity | Facility | By | Reference |
|---|
Transactions
Credit lots from accrual to settlement, Section 6418 transfers, and your Strata billing.
| Lot | Facility | Period | Tons | Credit value | Status |
|---|
| Transfer | Lot | Buyer | Price per $1 | Proceeds | Escrow | Date |
|---|
| Invoice | Period | Plan | Facilities | Amount | Status |
|---|
Plant health
Equipment, meter integrity, and reporting readiness across the fleet. Aegis has read-only access to OT.
Custody meter agreement • FAC-MIDLOTHIAN-01
Aegis rules
Work orders
Signed webhooks to SAP PM and IBM Maximo| Work order | Facility | Asset | Trigger | System | Opened | Status |
|---|
Subpart RR, Table RR-1 • FAC-MIDLOTHIAN-01
Q = Si − Sp − Se| Parameter | Category | Mass (MT) | Instrument / standard | Status |
|---|---|---|---|---|
| S_r | CO2 received | 60,499.44 | FT-402B Coriolis | Reconciled |
| S_q | Quarantined for drift | 18.07 | AEGIS-AUD-002 / 004 | Excluded |
| S_i | CO2 injected | 60,481.37 | FIT-501A | Certified |
| S_p | Produced or recycled | 0.00 | Non-EOR | Zero return |
| S_e | Surface emissions | 0.00 | OGI LDAR | Zero leakage |
| Q | Net sequestered | 60,481.37 | Section 45Q, Notice 2026-50 | Audit ready |
Laboratory
Accessioning to released result. Analysts are assigned only for methods they are certified on, instruments must be in control, and every result is peer reviewed before the Technical Director releases it.
| Accession | Sample | Method | Analyst | Holding time | Location | Stage |
|---|
Levey-Jennings
In controlWestgard rules • latest run
| Instrument | Methods | Last calibration | Next due | Last maintenance | QC today | Status |
|---|
| Name | Role | Method authorizations | Proficiency testing | Signature authority |
|---|
Competence records follow ISO/IEC 17025 clause 6.2: demonstration of capability per method, annual proficiency testing, and documented training. Assignment is blocked when a method authorization lapses.
| Item | Lot | Supplier / traceability | Expires | On hand | Used by | Status |
|---|
| NCR | Opened | Description | Source | Owner | Status |
|---|
Evidence and reports
Audit-ready evidence bundles, independent attestations, and proof that any record belongs to the sealed set.
| Bundle | Facility | Period | Net tons | PE | VVB | Status |
|---|
Statutory manifest • AREB Q4 Midlothian
Compile the manifest to build it from the sealed records.
Inclusion proof
The Merkle tree is rebuilt in your browser from the 100,000 sample records, so the result is computed, not displayed.
Audit path
| Record | Timestamp (UTC) | Tag | Value | Unit | Flag | Digest |
|---|
Users and access
Who can see and approve what. Approvals for transfers and CoA signatures require MFA at the moment of action.
| Name | Role | Facilities | Can approve | MFA | Last sign-in |
|---|
Recent sign-ins
| Time | User | Method | Location | Result |
|---|